![]() |
![]() |
T-Slotted Framing |
80/20 Product Overview
-
80/20's aluminum T-slotted profiles are the basic building blocks of "The Industrial Erector Set®". These T-slotted profiles are broken into seven families.
To view video click play button.10 Series - 1.00" increments and a .50" Centerline.
15 Series - 1.50" increments and a .75" Centerline.
20 Series - 20mm increments and a 10mm Centerline.
25 Series - 25mm increments and a 12.5mm Centerline.
30 Series - 30mm increments and a 15mm Centerline.
40 Series - 40mm increments and a 20mm Centerline.
45 Series - 45mm increments and a 22.5mm Centerline.

T-Slotted Aluminum ($164.40) Welded Steel ($224.38) 

What T-Slotted Framing Takes: What Steel Framing Takes: - Design Time
- Bill of Materials
- Purchase Materials
- Assemble Frame Per Design
- Design Time
- Purchase materials
- De-burred
- Weld
- Clean weld spatter
- Machine for mounting
- Mask non-paint areas
- Bill of Materials
- Cut to length
- Set up fixture
- Grind Wheels
- Degrease
- Primer Coat
- Paint
T-Slotted Framing Benefits: Welded Steel Expenses: - No welding - no fighting heat stress or warpage
- No priming or painting
- Lightweight, easy to machine
- Uses standard fractional or metric fasteners
- Less engineering time required
- Easy to fabricate; only simple hand tools required
- T-slot technology is industry accepted
- Great aesthetic value
- No expansive fabricationg equipment required
- Easily reconfigured for design changes
- Band Saw & Clamps
- Grinder & Sanding Disc
- Welder & Fuel
- Protective Equipment
- Paint Booth
- Skilled Labor
T-Slotted Bill of Material: Welded Bill of Material: Qty Description Cost 4 1515-Lt x 18" 32.40 4 1515-Lt x 21" 37.80 8 #7010 Saw Cut 15.60 8 #4301 Inside Corner Bracket 34.40 32 #3320 5/16-18 x 5/8" FBHSCS & Nut 19.20 30 Min. Assembly Labor Time 25.00 Total Project Cost $164.40 Qty Description Cost 4 1.5" x 1.5" x 1/8" wall x 18" steel tube 34.56 4 1.5" x 1.5" x 1/8" wall x 21" steel tube 40.32 N/A Sandpaper, cleaning supplies, tape, paint, ect. 24.50 5 hrs. Assembly Labor Time @ 25.00/hr. 125.00 Total Project Cost $224.38

